Current Language Switch Language to Persian  
  HomePage Services SiteMap ContactUs About  
     
 
HomePage
Services
Equipments
Organisation Chart
Professional Staff
Projects
Image Gallery
General Information
Site Map
Contact Us
About
 
     
     
     
     
     
     
 
 
Back to the Projects List...  
 
 
 

 

 
 
 
1 Project Name:  Piroozi St. Bridge – Reconstruction
2 Client:  Khakriz Ab Company
3 Consulting Engineers Co:  Sazian Consulting Engineer
4 Project Location:  Tehran – Iran
5 Start Date:  2004/07/06
6 Finish Date:  2005/02/18

 

Project Brief Description

 

·        Installing the bypass channel and passing the 2meter balance under the Piruzi Street

·        Destructing the old bridge with Picour about 980m3 armed concrete

·        Installing the floor and channel walls and prefabricated roof

·        Installing the prefabricated bridge with 9m opening

·        6500m3 excavation and mud-cleaning

·        2900m3 concreting capacity

·        5800000kg Armature capacity

·        5900m2 modeling capacity

 

 


 
     
  Back to the Projects List...